Wholesale Factory Price Heavy Duty Steel Plate Storage Rack Cantilever Shelf Pallet Racking Stacking Racks & Shelves

Product Description

Wholesale Factory Price Cantilever Shelf Pallet Racking Heavy Duty Steel Plate Storage Rack
Wholesale Factory Price Heavy Duty Steel Plate Storage Rack Cantilever Shelf Pallet Racking Stacking Racks & Shelves Industrial Racking Systems Range Product Specifications
A full variety of ranges and accessories available
1. Item: Cantilever Racking
2. Style: Quick access, adjustable
3. Material: Grade Q235 (or SS400) Q345
4. Certification: ISO9001
5. Standard Color: Blue (RAL5017), Orange (RAL2004), Green (RAL6000), Light Grey (RAL7035), Yellow (RAL1037)
6. Adjustable Pitch: 50mm, 50.8mm, 75mm, 76.2mm
7. Access Style: High accessibility & selectivity
8. Finishing: Powder Coated or Galvanized
9. Application Environment: Normal Temperature or Freezer
10. Design Service: Free CAD service available
11. Back-up Service: Installation Drawing / On Site Instruction
12. MOQ: 1 unit
13. Lead time: 3 weeks for 2*40' container
14. Standard package: Palletized, Export-Purpose Packaging
15. Container Load: 10-15 tons / 1*20' container, 20-25 tons / 1*40' container
16. Trade Term: EXW / FOB / CNF / CIF
Product Display Factory Storage Rack Production
Frequently Asked Questions
What materials are used for cantilever and pallet racking?

High-grade steel Q235, SS400, and Q345 are utilized to ensure optimal structural strength, safety, and heavy load-bearing performance.

Can the rack dimensions and arm heights be customized?

Yes, pitch levels are adjustable at 50mm, 50.8mm, 75mm, or 76.2mm, and customized configurations can be designed through free CAD services.

What surface treatments are available for anti-rust protection?

Surfaces can be treated with durable electrostatic powder coating in multiple standard RAL colors or hot-dip galvanized for extreme environments.

Can these racks be applied in cold storage or freezer facilities?

Yes, the systems are engineered to perform reliably across normal ambient temperatures as well as low-temperature freezer warehouses.

What is the minimum order quantity (MOQ) and production lead time?

The MOQ is 1 unit. Standard lead time is approximately 3 weeks for an order volume equivalent to two 40-foot containers.

What installation support and after-sales service are provided?

Detailed engineering installation drawings, step-by-step documentation, and optional on-site instruction services are comprehensively provided.

Related Products